Latymer Upper School - White Light
Explore White Light: White Light | HireWL | SalesWL | ShopWL

Latymer Upper School

The Project

Based in Hammersmith, West London, Latymer Upper School is London’s leading fully co-educational school. It recently built a brand-new, state-of-the-art Sports Centre, as well as refurbished their existing Sports Hall. WL was approached to oversee the technical installation in each space.

The Brief

Jason Larcombe, WL’s Project Manager, comments: “The brief was to offer a theatrical solution to the lighting of the buildings. We were approached at the beginning of the project and worked closely with the architects and consultants to ensure that we could incorporate our system into theirs”.

The Solution

WL worked specifically in two areas: the Sports Centre and the Sports Hall. The company was responsible for creating the technical design and, after frequent visits to the site, decided which technology would fulfil the brief and get the most out of each space.

The Sports Centre
Within the newly-built Sports Centre, there are three main spaces: the Swimming Pool, the Studios and the Gym. Due to the Swimming Pool being an area of high humidity, WL opted for 22x Studio Due ARCHIBARS 100 DRS. These were IP rated and have inter-changeable colours, creating a variety of mood settings. In Studios 1 - 3, which can used for anything from performance spaces to examination halls, WL drew on 48 x ChromaQ AR111 and 9 x ChromaZone CZ6-100C. This allowed for maximum flexbility in each room.

The Sports Hall
The Sports Hall required a rigging system to facilitate the various events taking place within the space. WL had to ensure that the roof could take the weight of any motors and trusses being installed. They also had to integrate their design with the existing overhead heating. As a result, they drew on a series of LTM LoadGuard Motors, suspended from custom-built Lindapter brackets. These were affixed to Prolyte H30V trusses. Each motor was controlled via a Pickle Controller, connected to a Low Level Facility Panel.

““We had to ensure that the equipment would not only make each area multi-purpose but also fit the exact requirements of that space. For instance, the lighting in the Sport Centre’s swimming pool had to be IP rated whilst the motors in the Sports Hall could not surpass a certain weight”.”

Jason Larcombe

Project Manager

The Results

“For years now, we have outsourced and hired technical equipment. With the Sports Centre being built, it made sense to invest in the latest equipment for these new facilities. As we have previously rented equipment from WL, they were the natural choice to approach for the installation. We were completely confident in their ability to deliver exactly what was required and we’re delighted with the potential each space now has”.

Alex Hirst, Consultant for Latymer Upper School

Key Information

The Client: Latymer Upper School
Project: Building of brand-new Sports Centre
Production Team:
Jason Larcombe - Project Manager
Julie Birkin - Project Manager
Simon Needle- WL Special Projects Director
Patrick Lockwood - WL Engineering Manager
Alex Hirst - Latymer Upper School Consultant
Brief: To oversee the technical installation within the brand-new Sports Centre alongside the refurbished Sports Hall.
Project Timeline:

  • Planning: Three years.
  • On-site Prep: Six months.

Equipment Inventory:
LTM LoadGuard Motors, Prolyte H30V Square Truss, Pulsar ChromaQ AR111, StudioDue ARCHIBAR 100 DRS, Pharos Touch Panel.

 

Photography - Guy Archard